Siding is being installed. And inside drywall is just finishing up.
649 S Oak - Cabinets & Sidewalks
Inside we installed the cabinets & other carpenter trim. Outside we rough graded and installed the sidewalks.
947 N Haddow
Rough plumbing is finished and we’re starting the hvac and fireplace install.
649 S Oak - Siding & Drywall
Siding is being finished and on the interior the drywall was just hung.
5N773 Rochefort - Final
Had a professional take some photos.
5N773 Rochefort - Final Photos
947 N Haddow - Framing & Trusses
The rough framing and roof trusses are finished. Next up is to install the windows.
5N773 Rochefort - Grading
Here we have the final rough grades, but we still need the top soil, landscaping, and driveway asphalt.
947 N Haddow - Foundation
Here we are starting another new home in Arlington Heights. Excavation is done and the foundation was poured. We’re just about to remove the forms and prep for backfill.
649 S Oak - Steel & Gravel
We started another home in Palatine. Foundation and backfill are complete. Here we set the steel and added gravel for the garage and construction drive. Carpenters are up next.