Fuzzy just finished grading the lot.
248 S Hale - Grading
Fuzzy just finished grading the lot.
Fuzzy just finished grading the lot.
The floors & stairs are in. Sidewalk, front, & rear stoop are poured. Interior doors, trim, and base are being installed.
Here is a rough front elevation for the spec house on Bothwell. Construction begins soon.
Here are a few rooms of Hale just after the drywall was put up before taping.
Thinking about something like this for Hickory.
We just passed the insulation inspection. The Brick & Siding Are just about done. Getting ready for drywall.
Just before plumbing, electrical, & HVAC.